Conceptual Alternatives Study (April 2008)
Conceptual Alternatives Study Report
Figures
Figure 1 Study Area Map
Figure 2 USGS Map
Figure 3 Curve Data
Figure 4A Community & Cultural Resources
Figure 4B Community & Cultural Resources
Figure 5 Landuse Map
Figure 6 Traffic Generators
Figure 7 Minority Population
Figure 8 Population Below Poverty Level
Figure 9 FEMA 100 Year Floodplain
Figure 10A Ecological Resources
Figure 10B Ecological Resources
Figure 10C Ecological Resources
Figure 10D Ecological Resources
Figure 10E Ecological Resources
Figure 10F Ecological Resources
Figure 10G Ecological Resources
Figure 10H Ecological Resources
Figure 11A Hazardous Materials
Figure 11B Hazardous Materials
Figure 11C Hazardous Materials
Figure 12 Fixed Route Bus Service
Figure 13 Indirect & Cumulative Boundary
Figure 14 Utility Facilities
Appendices
Appendix A-Alternative Description Features
ALL 75 Alts Description Table
Figure A1-1 Proposed Right-of-Way Limits Map
Figure A1-2 Proposed Right-of-Way Limits Map
Figure A1-3 Proposed Right-of-Way Limits Map
Figure A1-4 Proposed Right-of-Way Limits Map
Figure A2 Breese Road Option1
Figure A3 Breese Road Option2
Figure A4 Breese Road Option3
Figure A5 SR65 Option
Figure A6 Fourth Street Option1
Figure A7 Abandoned Railroad Option1&2
Figure A8 Abandoned Railroad Option3&4
Figure A9 SR 309 Option1
Figure A10 SR 309 Option2
Figure A11 SR 117 Option
Figure A12 SR 81 Option1
Figure A13 SR 81 Option2
Appendix B - Typical Sections
Typical Sections of Existing I-75
Typical Sections of I-75
Typical Sections of Sideroads
Appendix C - Land and Water Conservation Fund Listing
Land and Water Conservation Fund Listing
Appendix D - Agency Coordination
Agency Coordination
Appendix E - Preliminary Maintenance of Traffic Cost Summary Tables
Maintenance of Traffic Cost Summary Table
Appendix F - Cost Estimates
Cost Estimate Summary by Option
Appendix G - Utility Coordination
Utility Coordination Letters